Legal entity (HK parent)
Cathaywire International (HK) Limited (specimen — pending HK Companies Registry filing)
Specimen — released under NDA at qualified RFQ
PREVIEW Specimen partner desk · not for procurement
Cert numbers, entity registration & project references are placeholders pending counterpart sign-off. Verifiable PDFs ship under NDA on first qualified RFQ. · PRATINJAU — bukan untuk pengadaan resmi.
Identity & authorization
Overseas buyers should be able to verify the desk on day one. This page is the standing disclosure layer: legal entity, CTT authorization, UBO + sanctions screening, anti-bribery stack, Indonesia tax/customs entity, and the factory pedigree behind every shipment.
Legal substance
Legal entity (HK parent)
Cathaywire International (HK) Limited (specimen — pending HK Companies Registry filing)
Specimen — released under NDA at qualified RFQ
Indonesia subsidiary
PT Cathaywire Indonesia Niaga (specimen — pending OSS-RBA registration; KBLI 46591 + API-U intended)
Specimen — released under NDA at qualified RFQ
Manufacturer
Shenzhen Chengtiantai Cable Industry Co., Ltd. (publicly verifiable on the China NECIPS register; partner desk is a separate entity)
Operations office
Operations address released under NDA at qualified RFQ
Domicile · Indonesia
Jakarta domicile released under NDA at qualified RFQ
Fixed line
+852 2598-1483 (HK) · +86 755-2698-1857 (SZ)
CTT manufacturer authorization
Reciprocal cross-check
The manufacturer's overseas business desk confirms this authorization on email request. We share the signed scan + the most-recent scope appendix under NDA on first qualified RFQ.
Integrity, ownership & data
UBO (≥ 25 %)
Disclosed under NDA at first qualified RFQ. UBOs do not double as sales contacts.
PEP self-declaration
Per-UBO PEP form provided on RFQ; PEPs (if any) flagged on the disclosure pack.
Sanctions screening
Run on first qualified RFQ against OFAC SDN · UN · EU Consolidated · HMT · WB Ineligible · ADB Sanctions · AIIB Debarred · PPATK · DTTOT · DPPSPM. Screening certificate + screen ID shared with the buyer's compliance officer.
ISO 37001:2016 (anti-bribery)
Specimen — released under NDA at qualified RFQ
Pakta Integritas / KPK
Per-tender Pakta Integritas signed using the LKPP baku template — "Tidak akan melakukan praktek KKN; tidak akan memberikan / menerima hadiah atau apa pun kepada / dari pejabat; bersedia diperiksa oleh BPK / BPKP / KPK; bersedia menerima sanksi blacklist BUMN apabila terbukti melanggar." Counter-signed by partner-desk direksi per tender. Gratifikasi reported to KPK within 30 days of incident per PERMA 13/2017 + KPK PER-02/2014.
Indonesia customs status
PPJK (licensed customs broker) arrangement on first import lot; AEO/MITA application is a forward goal, not a current claim.
Data protection
Privacy notice at /privacy. Controller / DPO contact + retention + cross-border transfer mechanism disclosed there. UU PDP (ID) + HK PDPO + China PIPL applied to the relevant data flow.
Live screening reports + signed Code of Conduct + Pakta Integritas template are released under NDA on first qualified RFQ. State-utility tenders requiring originals on procurement letterhead can request courier dispatch from Shenzhen Yantian.
Behind every RFQ
The supply chain behind this site sits in a 65,000 m² production complex in Guangming, Shenzhen — CCV medium-voltage line, 120+ test instruments, approved supplier status with both State Grid and Southern Grid. CTT is the factory and production backer; Cathaywire is the overseas sales partner that runs RFQs, drum plans, payment routes, and shipping.
1983
Cable family since
Founder set up Guangdong Dacheng Wire Factory; current entity 1998-03-06.
65,000 m²
Production buildings
Chengtiantai Industrial Park, Guangming, Shenzhen.
120+
Test instruments
Including 30+ precision instruments; advanced CCV MV line.
Top 20
Guangdong cable industry
State Grid + Southern Grid approved supplier.
Factory audit allowance
Shenzhen Guangming site visit for PO ≥ USD 100k EPC.
Qualified EPC buyers get a shipping-paid one-day audit slot at the Guangming production complex — CCV line walk-through, extruder hours review, QA/QC log inspection, drum-marking and packaging spot-check. Booking 10 business days ahead via the RFQ thread; agenda + NDA shared on confirmation. Independent third-party inspectors (SGS / Intertek / Bureau Veritas) accepted alongside or in place of buyer-side attendance.
State Grid + Southern Grid AVL status, factory CCV line specs, monthly tonnage commit utilisation, and Sucofindo / PT TUV NORD verifier engagement letters released to attending buyer-side compliance under NDA on the audit day.
Next page
See the engineering documentation — IEC type-tests, MV screen design, ampacity matrix.